Installation details for Joyent’s Triton — Dell CTO lab

January 20, 2016

Here is our third and final post walking through the setting up of the Joyent Triton platform in the Dell CTO lab.  In the first post, Don Walker of the CTO office gave an overview of what we were doing and why.  The second laid out the actual components and configuration of the platform.

Today’s video is a walk-through of the installation process where Don shares his experience in setting up the Triton Platform.

When we pick this series up again it will focus on containerizing Dell’s Active System Manager and then loading it on Triton.  Not sure how long this work will take so stay tuned!

Some of the ground Don covers:

  • Before installing Triton, you need networking set up and working.  Don double clicks on the network configuration and what we did to make sure it was working.
  • Step one in installing Triton, is to create a bootable USB key and install the head node.  There is a scripted set up which is dead simple. Lays down SmartOS and Triton services
  • Compute node install is also scripted which contains a lot of the info you entered during the head node configuration.  After this you run acceptance tests
  • Great support from Joyent with a couple of small issues we had
    • Unacceptable character in pswd. This info was fed back to the devs and is now fixed.
    • We forgot to disable the SATA port and kept getting error messages. Once we disabled it, it worked.
  • Reference: Installing Triton Elastic Container Infrastructure — Joyent website

Extra credit reading

Pau for now…


The platform supporting Joyent’s Triton — Dell CTO lab

January 19, 2016

Continuing from the previous post, here is a more detailed explanation of the Joyent Triton platform we set up in the CTO lab.  Triton is Joyent’s elastic container infrastructure that runs on their cloud, a private cloud or both.

The idea behind setting up this instance is, working with Joyent, to learn about the platform.  The next step is to work with the Dell Active System Manager (ASM) team to decompose ASM into microservices and then run it on the Triton platform.

Take a listen as Don walks through the actual layout of the instance.

Some of the ground Don covers

  • Our minimalist set-up featuring two Dell R730 servers (the schematic only shows one for simplicity. An R730 contains two 520s).  Don explains how they are configured and how ZFS affects the set up.
  • The two Dell Force 10 S6000 switches.
  • A double-click on the networking set up
  • The roles the compute and head nodes (the head node acts as the admin into the system).
  • Reference: Installing Triton Elastic Container Infrastructure — Joyent website

Extra credit reading

Pau for now…


Incorporating DevOps into the development of Dell’s Active System Manager

November 5, 2015

As Dell as a company continues to evolve we have started implementing DevOps practices in our software development.   Dell IT is employing DevOps as are some of our product development teams.

In the following video, systems engineer Chris Gully explains how Dell’s Active System Manager has incorporated DevOps into its development. (the audio could be a bit better so you’ll have to crank it up a bit for Chris 🙂

Some of the ground Chris covers:

  • What is the Dell Active Systems Manager (ASM)
  • Putting the ASM code up on GitHub
  • Their path from Dev -> IT -> Ops -> Customer -> Feedback
  • What were some of the issues the team had to overcome when implementing